PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Repairing the inside Stairwell -5 (1st Floor)(800x600).jpg Started bathroom roughing at Toilet Room 169 Facing South (800x600).jpg Started installing wire mesh at the 4th Floor Facing North (800x600).jpg Top metal track and electrical conduit at the 1st Floor Facing South-West (800x600).jpg Top metal track at the 2nd floor Facing South (800x600).jpg
Previous page Top metal track at the 2nd floor Facing South (800x600)
Top metal track at the 2nd floor Facing South (800x600)